1. Initial consultation
Discuss the client’s vision, needs, and budget. Take note of style preferences, functionality requirements, and any specific materials or fixtures.
2. Site Visit and Measurements
Visit the bathroom to take accurate measurements. Document existing plumbing, electrical points, and structural elements.
3. Concept Development
Create rough sketches or mood boards to visualize design ideas.
Present initial concepts to the client for feedback.
4. 3D Modelling
Create a detailed model. Include layout, fixtures, finishes, lighting, and textures.
5. Client Review and Revisions
Present the 3D model to the client. Gather feedback and make necessary adjustments to the design.
6. Final Renderings
Produce high-quality renderings for a realistic view of the finished space, providing multiple angles and if needed.
7. Technical Drawings and Documentation
Generate floor plans, elevations, and installation guides from the 3D model. Include specifications for contractors and suppliers.
8. Post-Project Follow-Up
Review the completed renovation with the client.